Night work in Bochum: Dismantling the press over the covered Roof.

A significant reduction in water and energy consumption with a good 25% increase in output compared to 2020 – the results of the modernisation work in Bochum are impressive. This was preceded by the almost complete dismantling down to the lower beam, the removal of the upper beam and the three press cylinders, to name just the most important modernisation work on our powerhouse on the warm side in Bochum. After six weeks of hard work (and a few sleepless nights) the time had come: our press was pressing again. And the result is impressive: More power with significantly reduced water and energy consumption. A win for the environment.